Customization: | Available |
---|---|
Application: | Furnace Linings, Glass Production, Steelmaking Industry, Industrial Furnaces |
Production Process: | High-Performance Refractory Cement |
Still deciding? Get samples of US$ 1/kg
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment methods: | |
---|---|
Support payment in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Technical Data of High Alumina Refractory Cement
Product | CA-65 | CA-68 | CA-70 | CA-75 | CA-80 | |
Chemical Composition (%) | Al2O3 | 64-66 | 67-69 | 69-71 | 73-75 | 77-80 |
CaO | 32-34 | 29-31 | 27-29 | 23-25 | 18-20 | |
SiO2 | 1.8 | 1.2 | 0.3 | 0.3 | 0.3 | |
Fe2O3 | 0.6 | 0.6 | 0.3 | 0.3 | 0.3 | |
Specific Surface (cm2/g) | 4500 | 4500 | 5000 | 5500 | 7000 | |
Setting time (h:min) | Initial setting (min) | 0:40 | 0:40 | 0:40 | 0:45 | 0:45 |
Final Setting (min) | 8:00 | 8:00 | 10:00 | 10:00 | 10:00 | |
Cold Modulus of Rupture (MPa) | 24 hour | 6.0min | 6.0min | 6.0min | 6.0min | 5.0min |
72 hour | 8.0min | 8.0min | 8.0min | 8.0min | 6.0min | |
Cold Crushing Strength (Mpa) | 24hour | 45.0min | 45.0min | 45.0min | 45.0min | 35.0min |
72hour | 70.0min | 70.0min | 70.0min | 70.0min | 60.0min | |
Refractoriness (°C) | 1680 | 1710 | 1730 | 1750 | 1770 |
High alumina cement is mainly used to configure refractory castable such as high alumina low cement castable which can build or repair furnace or kiln for heat insulation or high temperature erosion.
Rongsheng Refractory has professional sales and after-sale service team who provide customers all-around service about product application, construction installation and operation technology training etc.
Every possible precaution is taken to ensure our products in prime condition when reach customers around the world.
1.25kgs / bag or 1000kgs / big bag with or without pallet, or by customer's request.
2.Normally loading 25 tons in 1 FCL.
Every possible precaution is taken to ensure our products in prime condition when reach customers around the world.By sea or air. Normally 7 to 14 Days for delivery, according to your order quantity.
ZHENGZHOU RONGSHENG REFRACTORY CO., LIMITED has 30 years of experience in R & D and design of unshape refractory experts, holds 20 utility model patents and 7 invention patents, and has passed the ISO quality, environment and safety management system certification. The company is committed to the R & D, production and service of refractories used in metallurgy, electric power, nonferrous metals, building materials, chemical industry and other industries. Its products cover 198 kinds of materials and 2369 varieties in three categories (acidic, neutral and alkaline), providing overall solutions for refractories for 1200 domestic and 200 foreign customers.
Rongsheng Refractory has professional sales and after-sale service team who provide customers all-around service about product application, construction installation and operation technology training etc. Now we have established cooperation relationship with many science and research unit and our products have been sold to Japan, Indonesia,Kazakhstan and Vietnam etc.
Rongsheng Refractory insists on pursuing the management idea of "honest, courtesy, innovation and professionalism" as the purpose,taking the "low price for better quality" as the foundation of enterprise development and creating "Rongsheng Brand" as the enterprise strategic goal. And Rongsheng provides satisfying, timely and efficient service for customers based on scientific management process, complete customer information management system and abundant products types.
Q: Are you trading company or manufacturer ?
A: We are Manufacturer of refrcatory materials, We can provide you with high quality products at more competitive prices.
Q: When can I get the price?
A: We usually quote within 24 hours after getting your detailed requirements, like size, quantity etc. If it is an urgent order, you can call us directly.
Q: What about the lead time for mass product?
A: The lead time is based on the quantity, about 7-12days.